Monday, March 7, 2011

Day 2.

Today in the morning we were talking about some of the mistakes every one did on monday and we talked about how to fix the mistakes and to make sure they dont happan again.

After we finished talking we went of to do our jobs, Me,Taz,Jade,Harison,Eren and Daniel went off to finish the gussets.
Chris showed us that we need to put weight down on the stations before there glues into place by the gussets. The reson for this is so the stations dont move around when your screwing. The other factor we found out is that the Straigh Edge we used had some Glue lumps ( some 1 did'nt clean up there mess after useing it ) and that made the Straigh Edge harder to use in the area, it had lumps so we had to clean up the area of lumps before useing it.

We finished all the stations with the gussets in 2 hours.

After we finished with the stations we helped out the others with there work which included putting in Station 0 and station 1 into place on the frame. Putting on the stations is abit of thinking to do, you have to make them all plum an use weges to raise up the station on each side to make it plum.

Once station 0 was put into place we made the Center Line (CL) on the frame.
Than it was time to fit in station 1. In order to place station 1 on we had to do some thinking on how to get the water line ( WL ) on the same measurements from station 0.

1 comment:

  1. How is it Goran?

    Good to see you blogging again.

    This is a really good posting and describes well what you covered on the first and second day.
    It will be alot better when you insert some pictures and talk about these.
    Keep up with this good work.

    ReplyDelete