Wednesday, July 6, 2011

Splash for Hull.

This is the lay out of the Splash.  It was writen down onto the hull so who ever is working on it they can have a look incase they forget.           

we got the measurements on the splash an we transfered in onto the final peace.
this is a photo of the layout.
Here were spreading the polyester, we had to wear resperators due to the strong fumes and also to wear safety glasses incase in goes into ur eyes.

Glassing the Hull ( outside )

Were getting ready to glass the Fp on the hull. Taz is vacuming all the dust off the hull before we go on.                            

here im sanding the bow of the boat to get it fair.

Dry fitting the glass before moveing on and all the vacum tape has been put on. Were useing EDB-400 for the outside of the hull.

Dry Fitting glass.

Photo of me getting the glass on with rollers.        

We had around 5 people working on getting the glass down while we had 1 person mixing the resin for it. we Taz is working on getting the edges of the glass down while were getting putting on the resin on the glass.

Photo of us putting the resin onto the glass.      



Once all the glass was done and all our peel ply, perft plasic, mesh was down we put on the vacum bag and you can see us working on putting so darts in the bag.                                                       

Selaing the hull ( with normal resin )

As there was not enough wood sealer to go around for the hull Chris ( tutor ) made desision to seal it with normal resin. We used about 20 pumps on resin for the hull.  I recored the pumps just so we know how many we used. The resin was spread around by rollers as it was much easier to do so. In the photo below it shows how we did it. At the point where chris is pointing he was telling us that we didnt put on enough resin and it was abit dry so we had to go over it again. The resin socked into the seeder so we had to put on abit of resin in order to get the proper seal.             

In this photo were almost done sealing the hull, Taz is working on the final part at the Fp. we stopped around 400mm from the fp with the seal.

Chain Plates

I and Chris ( american chris haha ) were working on getting the positon of the chain plates in place. As you can see on this photo we found out where they had to go and than we cut out the foam at that place. We went as far as we could getting the foam out but we Stopped  before hitting the glass.


Once the foam was out we started to mix the glue and started to put it onto the glass where the chain plates will go.The glue had to be thick enough so it dose not slide down off the glass.                     

here is a photo of us putting the glue on              

Once everything was done we got the Glass plates into positon and was held into place by the blocks which were gently screwed onto the foam ( the screws were short enough so they dont go into the glass ). We also put down mdf wood intop of the plates just so the blocks can rest on it and give us more hold when the screws went on.                                    

Fairing Hull/Back filling

this photo here is of the hull once we flipped it over we had some help from the guys in the other class in order to have enough hands to flip it over.


we put the hull into the hot box and we were getting ready to fair it. There was not 2 much fairing to do because most of the boat was already fair.

here is a photo of the center case  before it was cut into position

working on the transom cutting off the planking on the back so it comes flush with the ap                                                  

here is a photo of me planeing the hull takeing all the glue bumps off and also getting it as much fair as possible before we started to do sanding



this photo here was taken once all of the sanding and planeing was done. as you can see Richard is feeling the hull with his hand if its fair.


once the center case was cut to shape and flush with the hull

once all the fairing was done on the hull we back filled, just to get all of the gaps closed that were on hull.                         

Monday, July 4, 2011

Group Work Task 2

Group work Task 2.

In this video were doing non-verbal communication skill for poerfolio task 2.

in the video we have, Harrion , Jade  and Me

Group Work.

For our Portfolio we had 4 group members: Taz,Jade,Harrison and Goran(me).
Each one of us had there own tasks we had to work on.

Task 1=Harrison
Task 2=Goran
Task 3=Taz
Task 4= All group members solo work
Task 5=Jade