Monday, March 21, 2011

On Tue i an greg finished setting up the grid for the Deck and Cabbon top.
We marked out all the station lines and CL. in order for us to get the correct Beam measurements we went on AutoCad and found out the measurements for each station.
After we found out the measurements we made a frame where the deck an cabbon top are going to sit on, we made it on 720mm out from the CL untill it hits station 6, after station 6 we made it go down 100mm in order to give us the shape.

Once we got all the measurements into place we got the planks ready.
The planks were 5.5m long, 45mm width. I and Taz made 4 planks. 3 were for the frames, 1 was to make brase from. After all the wood was ready we got the correst measurements and cut them into the correct lengths for the Grid.

We used No More Nails glue in order to glue the wood onto the floor than we put heavy objects ontop of the wood so it stays into place for at least 24 hours minimum for the glue to get its full power.

Photos.